Installation of furniture for new build school including assorted classrooms, nursery, PPA room, nurture room, staffroom, kitchen areas, caretaker's room, store and ICT room with bespoke wall storage systems

Value: £43k
Duration of works: 2 weeks
Client: Walter Carefoot & Sons, Preston
Architect: NPS Wigan

klick sticker image turkey
I was very impressed with the staff at Klick Technology who were all more than helpful. Klick had to adapt the furniture to suit site conditions, through no fault of their own and this was managed in a professional way. The operatives were very helpful and worked in a safe and tidy manner. The team pulled out all the stops on a tight schedule and came up trumps!

Bert Maddock - Site Manager, Walter Carefoot and Sons, Preston, Lancashire - Re Beech Hill Community School, Wigan
klick sticker image turkey

Project Details

  • Pre-installation survey
  • Manufacture of furniture
  • Delivery and distribution of furniture on site
  • New furniture installed
  • Builders clean


Project Brief

The school was housed in temporary portacabins whilst the building work was in progress. There was a tight schedule to ensure the move into the new school was on time. This involved close co-operation with Carefoot, the main contractor handling the project, particularly during the final stages when our fitters were working alongside their staff.

Site meetings were held at the planning stage to ensure accurate interpretation of the architects' drawings and so that the needs of the school were fully understood. Bespoke items such as the wall units for IT software storage & dual height sinks were developed to suit the school's requirements.

Trespa was specified as the work top material throughout. Its durability is ideal in a primary school environment where life span was considered a major priority.

The furniture was manufactured, delivered and installation completed for handover within the tight timescales given.

See what our customers say about us...



Download the PDF

PDF download

View our Case Studies

Islamia Girls School London
[ Food Technology room refurbishment ]
Halesowen College, West Midlands
[ New Science Laboratory furniture and installation of new laboratory furniture for 8 labs and 5 prep rooms ]
Windsor Park Middle School, Uttoxeter
[ Installation of furniture for food technology room and prep area ]
Wyvern College, Salisbury, Wiltshire
[ Refurbishment of 3 science labs and partial refurbishment of 4th lab ]
Brannel School, St Austell, Cornwall
[ Installation of specialist fixed furniture for 69 rooms ]
Chipping Norton School, Oxfordshire
[ Installation of furniture for new build science block ]
Scarborough College, North Yorkshire
[ Complete Refurbishment of Biology Lab S8 ]
Beech Hill Community Primary School
[ Installation of furniture for new build school ]
Robert Bloomfield Academy, Bedfordshire
[ Installation of furniture for 2 Science Laboratories and 2 Prep Rooms ]
Gen-Probe Life Sciences
[ Supply and installation of furniture for Genetic Testing Facility ]
Baxter Healthcare Cowley, Oxfordshire
[ Furniture for pharmaceutical aseptic suites ]
Darrick Wood Senior School, Orpington, Kent
[ Refurbishment of Food Room ]
Dr Challoner's Grammar School, Amersham
[ Installation of furniture for Biology Laboratory and Prep Room ]
Epsom & Ewell High School, Surrey
[ General Refurbishment ]
Epsom & Ewell High School, Surrey
[ ICT / Library ]
St Ambrose College, Hale Barns, Cheshire
[ Refurbishment of 1960's science lab ]
Notre Dame Catholic 6th Form, College Leeds
[ Refurbishment of 6 science labs ]
King's School, Winchester, Hampshire
[ Conversion of two ICT rooms into science lab ]
Chislehurst and Sidcup, Grammar School Kent
[ Multi-room furniture installation ]
Torc Campus, Tamworth, Staffordshire
[ Installation of special needs furniture ]
Christ The King Catholic, Preston
[ Extensions to accommodate 2 new Science Labs ]
Mary Elliot School, Walsall, Birmingham
[ Installation of furniture for special needs school ]
Priestley College, Warrington, Cheshire
[ Conversion of 7 small rooms into Science Laboratory and Prep Room ]
Sussex Coast College
[ Design & Installation ]
Rochester Grammar School
[ Installation of furniture for new build school ]
Woodchurch High School Wirral
[ Installation of specialist fixed furniture ]
Further case studies
See what our customers say about us...

We are registered with...

Construction LineGas Safe RegisterCSCSCHAS