Klick Technology - School Furniture - Educational Furniture Products Klick Technology Darrick Wood School
Klick Technology - Case Studies

Darrick Wood Senior School, Orpington, Kent

Customer testimonials

Quarterly Newsletter
| Share
Refurbishment of Food Room to provide Commercial Catering Facilities

Value: £80k
Duration of works: 8 weeks

klick sticker image turkey
"We are very pleased with our new stainless steel GCSE catering facility. Klick Technology were resourceful in finding solutions to the various design and site issues that arose. Their service was extremely good and I am looking forward to working with them on a second room to be installed next year."
Jill Thomas - Head of Food Technology, Darrick Wood Senior School, Orpington, Kent
klick sticker image turkey

Project Details

  • Disconnect existing services and make safe
  • Strip out all existing furniture
  • Remove old radiators and replace with panel radiators above worktop height
  • Installation of all new plumbing and electrical services
  • Provide interactive services
  • Installed new lighting (CAT 2)
  • Installed mushroom extraction fans within existing roof lights
  • Flooring and decoration renewed
  • Installed hygenic cladding
  • New stainless steel furniture fitted
  • Final connection of gas, water, and electrics
  • Commissioning and certification of all works

Project Brief

The brief was to completely refurbish Room DT5, providing a stainless steel catering facility to upgrade the school's food technology facilities. We were contracted directly by the school and liaised closely with their site management team.

It was necessary to design the room to incorporate specific cookers in order to make use of an existing extract system. An upgrade of the school mains supply board was needed to incorporate 3 phase supplies necessary for the catering equipment required. All services were hidden behind panelling and hygenic cladding was installed.

Klick Technology supplied and installed the appliances and both the commercial & domestic ovens required for the room.

The project was started during termtime and completed on time and within budget during the summer holidays.

See what our customers say about us...



Download the PDF

PDF download

View our Case Studies

Windsor Park Middle School, Uttoxeter
[ Installation of furniture for food technology room and prep area ]
Wyvern College, Salisbury, Wiltshire
[ Refurbishment of 3 science labs and partial refurbishment of 4th lab ]
Brannel School, St Austell, Cornwall
[ Installation of specialist fixed furniture for 69 rooms ]
Chipping Norton School, Oxfordshire
[ Installation of furniture for new build science block ]
Scarborough College, North Yorkshire
[ Complete Refurbishment of Biology Lab S8 ]
Beech Hill Community Primary School
[ Installation of furniture for new build school ]
Robert Bloomfield Academy, Bedfordshire
[ Installation of furniture for 2 Science Laboratories and 2 Prep Rooms ]
Gen-Probe Life Sciences
[ Supply and installation of furniture for Genetic Testing Facility ]
Baxter Healthcare Cowley, Oxfordshire
[ Furniture for pharmaceutical aseptic suites ]
Darrick Wood Senior School, Orpington, Kent
[ Refurbishment of Food Room ]
Dr Challoner's Grammar School, Amersham
[ Installation of furniture for Biology Laboratory and Prep Room ]
Epsom & Ewell High School, Surrey
[ General Refurbishment ]
Epsom & Ewell High School, Surrey
[ ICT / Library ]
St Ambrose College, Hale Barns, Cheshire
[ Refurbishment of 1960's science lab ]
Notre Dame Catholic 6th Form, College Leeds
[ Refurbishment of 6 science labs ]
King's School, Winchester, Hampshire
[ Conversion of two ICT rooms into science lab ]
Chislehurst and Sidcup, Grammar School Kent
[ Multi-room furniture installation ]
Torc Campus, Tamworth, Staffordshire
[ Installation of special needs furniture ]
Christ The King Catholic, Preston
[ Extensions to accommodate 2 new Science Labs ]
Mary Elliot School, Walsall, Birmingham
[ Installation of furniture for special needs school ]
Priestley College, Warrington, Cheshire
[ Conversion of 7 small rooms into Science Laboratory and Prep Room ]
Sussex Coast College
[ Design & Installation ]
Rochester Grammar School
[ Installation of furniture for new build school ]
Woodchurch High School Wirral
[ Installation of specialist fixed furniture ]
Further case studies
See what our customers say about us...

We are registered with...

Construction LineGas Safe RegisterCSCSCHAS