Robert Bloomfield Academy, Bedfordshire

Customer testimonials

Quarterly Newsletter
| Share
Installation of furniture for 2 Science Laboratories and 2 Prep Rooms

Value: £36k
Duration of works: 2 weeks
Project Management: NPS

klick sticker image turkey
We used Klick Technology in 2002 to refurbish two of our very outdated Science Labs. The product and service were very good and the furniture has stood the test of time, the labs still look as they did when they were first installed. We recently built two new Science Labs and again found that Klick provided us with the best design at the best value. We would not hesitate to use Klick Technology again in the future.

Gul Baust - School Manager, Robert Bloomfield Academy
klick sticker image turkey

Project Details

  • Pre-installation survey
  • Isometric drawings for approval
  • Bespoke product design
  • Manufacture of furniture
  • Delivery and distribution of furniture on site
  • New furniture installed
  • Deep clean


Project Brief

The brief was to come up with a room layout based on the Faraday principles. Throughout the design process there was close collaboration with the Head of Science. He prefered the teachers desk to be positioned at the rear of the lab so that he could observe the pupils' activity whilst carrying out demonstrations which would be viewed by the pupils on the whiteboard at the front of the lab.

Klick Technology developed a bespoke upstand around the sink, at the request of the school, to prevent water splashing onto the theory workspace.

The school requested neutral furniture with Velstone worktops and wanted the rooms to appear quite clinical as they have specialist Science status. However as a middle school they felt it was appropriate to introduce a highlight colour and did this with bright stools and trays.

The lab was part of a new build extension block to the school. Klick worked closely with the builder regarding service positions and the planning of the furniture installation which was all completed to schedule.

See what our customers say about us...



Download the PDF

PDF download

View our Case Studies

Islamia Girls School London
[ Food Technology room refurbishment ]
Halesowen College, West Midlands
[ New Science Laboratory furniture and installation of new laboratory furniture for 8 labs and 5 prep rooms ]
Windsor Park Middle School, Uttoxeter
[ Installation of furniture for food technology room and prep area ]
Wyvern College, Salisbury, Wiltshire
[ Refurbishment of 3 science labs and partial refurbishment of 4th lab ]
Brannel School, St Austell, Cornwall
[ Installation of specialist fixed furniture for 69 rooms ]
Chipping Norton School, Oxfordshire
[ Installation of furniture for new build science block ]
Scarborough College, North Yorkshire
[ Complete Refurbishment of Biology Lab S8 ]
Beech Hill Community Primary School
[ Installation of furniture for new build school ]
Robert Bloomfield Academy, Bedfordshire
[ Installation of furniture for 2 Science Laboratories and 2 Prep Rooms ]
Gen-Probe Life Sciences
[ Supply and installation of furniture for Genetic Testing Facility ]
Baxter Healthcare Cowley, Oxfordshire
[ Furniture for pharmaceutical aseptic suites ]
Darrick Wood Senior School, Orpington, Kent
[ Refurbishment of Food Room ]
Dr Challoner's Grammar School, Amersham
[ Installation of furniture for Biology Laboratory and Prep Room ]
Epsom & Ewell High School, Surrey
[ General Refurbishment ]
Epsom & Ewell High School, Surrey
[ ICT / Library ]
St Ambrose College, Hale Barns, Cheshire
[ Refurbishment of 1960's science lab ]
Notre Dame Catholic 6th Form, College Leeds
[ Refurbishment of 6 science labs ]
King's School, Winchester, Hampshire
[ Conversion of two ICT rooms into science lab ]
Chislehurst and Sidcup, Grammar School Kent
[ Multi-room furniture installation ]
Torc Campus, Tamworth, Staffordshire
[ Installation of special needs furniture ]
Christ The King Catholic, Preston
[ Extensions to accommodate 2 new Science Labs ]
Mary Elliot School, Walsall, Birmingham
[ Installation of furniture for special needs school ]
Priestley College, Warrington, Cheshire
[ Conversion of 7 small rooms into Science Laboratory and Prep Room ]
Sussex Coast College
[ Design & Installation ]
Rochester Grammar School
[ Installation of furniture for new build school ]
Woodchurch High School Wirral
[ Installation of specialist fixed furniture ]
Further case studies
See what our customers say about us...

We are registered with...

Construction LineGas Safe RegisterCSCSCHAS