Torc Campus, Tamworth, Staffordshire

Installation of furniture for special needs school in 68 areas including Science, Food Technology, Art, Design, Music, Medical, Laundry rooms and General Classrooms

Value: £100k
Client: Willmott Dixon
Duration of works: 8 weeks

klick sticker image turkey
"It was quite some achievement to co-ordinate the installation of furniture into 68 different areas within the school. However, Klick managed it and we are all very pleased with the end result. The children are thrilled to have a proper school at last!"
Vicky Vernon - Head Teacher, Torc Campus, Tamworth, Staffordshire.
klick sticker image turkey

Project Details

  • Pre-installation survey
  • Manufacture of furniture
  • Delivery and distribution of furniture on site
  • New furniture installed
  • Builders clean

Project Brief

The brief was to co-ordinate the supply and installation of the furniture for the school. This involved close co-operation with Willmott Dixon, the main contractor handling the redevelopment of the site. We liaised closely with the procurement team to finalise the furniture requirement for each of the 68 rooms and then provided drawings for all relevant areas.

Room layouts were fine tuned to accomodate children with special needs, including the provision of adjustable height furniture.

The furniture was manufactured, delivered and distributed to the different rooms prior to installation by our fitters. The number of rooms involved made this a complex project to organise and required significant logistical input. This ensured the project was handed over on time and within budget.

See what our customers say about us...
[48kb pdf download]



Download the PDF

PDF download

View our Case Studies

Baxter Healthcare Cowley, Oxfordshire
[ Furniture for pharmaceutical aseptic suites ]
Bootle High School, Merseyside
[ Refurbishment of textile and food rooms ]
Darrick Wood Senior School, Orpington, Kent
[ Refurbishment of Food Room ]
Dr Challoner's Grammar School, Amersham
[ Installation of furniture for Biology Laboratory and Prep Room ]
Epsom & Ewell High School, Surrey
[ General Refurbishment ]
Epsom & Ewell High School, Surrey
[ ICT / Library ]
St Ambrose College, Hale Barns, Cheshire
[ Refurbishment of 1960's science lab ]
Notre Dame Catholic 6th Form, College Leeds
[ Refurbishment of 6 science labs ]
King's School, Winchester, Hampshire
[ Conversion of two ICT rooms into science lab ]
Chislehurst and Sidcup, Grammar School Kent
[ Multi-room furniture installation ]
Torc Campus, Tamworth, Staffordshire
Christ The King Catholic, Preston
[ Extensions to accommodate 2 new Science Labs ]
Mary Elliot School, Walsall, Birmingham
[ Installation of furniture for special needs school ]
Priestley College, Warrington, Cheshire
[ Conversion of 7 small rooms into Science Laboratory and Prep Room ]
Further case studies

We are registered with...

Construction LineCorgi GasCSCSCHAS