Notre Dame Catholic 6th Form, College LeedsPhase 1 - Refurbishment of 6 science labs
Phase 2 - Complete refurbishment of library

The brief for Phase 1 was to completely refurbish 6 science labs. Our in house design team worked on different layouts according to the specialism taught in each laboratory. These included biology, physics, chemistry and environmental science. It was important to accurately interpret the needs of the individual teaching staff and the design was modified until it finally reflected their requirements.

Epsom & Ewell High School, SurreyRefurbishment of Science lab, Food Technology room, ICT rooms, Library, Main Hall, English & Maths blocks and changing facilities. Upgrade of all ceilings and ICT facilities throughout the school.

After an extensive tender procedure we received instruction to design and supply furniture into various areas of the school to compliment the fit-out work undertaken by Klick.

Woodchurch High B.S.FInstallation of specialist fixed furniture for new build school Including 4 physics labs, 4 chemistry labs, 3 biology labs/2 prep rooms, 2 food technology rooms, ICT, art, textiles, ceramics, maths, english and recording studio, etc.

Woodchurch High School is a £23.5m project which is part of the Building Schools for the Future programme coordinated by The Metropolitan Borough of Wirral.

Brannel School, St Austell, CornwallInstallation of specialist fixed furniture for 69 rooms in new build school including 5 science labs & prep room, assorted music rooms & recording studio, food tech & prep, art rooms, textiles, resistant materials, ICT and assorted general classrooms.

Klick Technology were successful in winning the fitted furniture contract for the new high tech £17.5m Brannel School in January 2011. There was a tight schedule to manufacture the furniture and only 7 weeks allocated for installation on site.