Case Studies

Primary & Middle Schools

Hilden Grange Preparatory School

Conversion of disused canteen / store room into D & T room

Klick were involved in discussions at the early stages of this project regarding the feasibility of converting a disused canteen into a food technology or D & T room. The adjacent gym had previously been used as the dining hall with a hatch through to the canteen. When new dining facilities became available elsewhere the school wanted to make the most of the redundant space.

case-clapham-manor-1ex

Conversion of classroom into Primary school food technology room with prep area

The school actively promote healthy eating and wanted to convert a first floor classroom into a new food technology room suitable for primary school children. The design was to accomodate 8 electric cookers at a lower height of 770mm.

Elmscot Day NurseryInstallation of new toilet cubicles and vanity units for 1st and 2nd floor toilets and changing areas

The nursery were looking for a company to manage this logistically challenging refurbishment, having experienced difficulties on a previous project. Elmscot Day Nursery is open until 6pm every weekday. There are also strict guidelines to working conditions whilst toddlers are on site.

Kettering AcademyNew fitted furniture for

Kettering Buccleuch Academy
Installation of specialist fixed furniture for 40 rooms in a new build academy including 7 science labs, 1 prep, 2 Food technology rooms, 3 D & T rooms, Art, Reprographics and general classrooms

St Michael's C of E Primary SchoolInstallation of furniture for new build extension to school including 8 classrooms, a staff workroom, a store and entrance

Klick Technology worked closely with the team at Higgins Construction to ensure the installation ran smoothly and the project was completed on time despite a very tight schedule.

Robert Bloomfield Academy, BedfordshireInstallation of furniture for 2 Science Laboratories and 2 Prep Rooms

The brief was to come up with a room layout based on the Faraday principles. Throughout the design process there was close collaboration with the Head of Science. He prefered the teachers desk to be positioned at the rear of the lab so that he could observe the pupils' activity whilst carrying out demonstrations which would be viewed by the pupils on the whiteboard at the front of the lab.

The Beech Hill Community Primary School, WiganInstallation of furniture for new build school including assorted classrooms, nursery, PPA room, nurture room, staffroom, kitchen areas, caretaker's room, store and ICT room with bespoke wall storage systems

The school was housed in temporary portacabins whilst the building work was in progress. There was a tight schedule to ensure the move into the new school was on time. This involved close co-operation with Carefoot, the main contractor handling the project, particularly during the final stages when our fitters were working alongside their staff.

Windsor Park Middle School, UttoxeterInstallation of furniture for food technology room and prep area

The Head of Technology selected 16mm Black Craquele Trespa for the worksurfaces which co- ordinates well with the PVC hygienic splashback. The aim was to create the appearance of a contemporary domestic kitchen which the students could relate to.

Ralph Sadleir Middle School, PuckeridgeRefurbishment of science lab and prep area

There was an extensive design process for this project which resulted in a layout which accomodates 30 students, maximises limited space and has flexibility of use.