Case Studies

Refurbishment Projects

South Cheshire College, Crewe

Conversion of 2 classrooms into a science laboratory

South Cheshire College were looking for a company to provide a full refurbishment service as two rooms were to be converted into one large science laboratory. The brief was to create a contemporary laboratory with ‘wow’ factor that would inspire higher education students and make the most of the new spacious room.

case-St-James-1ex

Refurbishmnent of 2 science laboratories

The brief was to improve the teaching facilities in two of the school’s labs. The school wanted to create impact in the new labs but within a tight budget. The layout needed changing so that the students would be orientated towards the front giving them greater focus on the teacher.

Wymondham College, Norfolk

Conversion/partial refurbishmnent of 2 maths classrooms into science laboratories

The school wanted to increase the size of two of their maths classrooms to make them into full size science labs suitable for 30 students.

St Joseph’s Catholic High School, Slough

Full refurbishment of 3 science laboratories, prep room & admin area

The school wanted to improve the teaching of science by upgrading the facilities in three of their science labs. The brief was to improve the design to facilitate better sight lines to the board, access to the services and general circulation.

Kings School Gloucester

Full refurbishment of science laboratory

The school wanted to replace their outdated Iroko chemistry lab so that the students could benefit from a really contemporary design with improved facilities and materials.

case-ashcroft-2ex

Full refurbishmnent of 10 science laboratories

The school required an extensive refurbishment of their science facilities to be completed by the end of the summer holidays.

case-st-edmunds-girls-1ex

Refurbishment of 6 labs, 4 preps, staff room and corridor

Klick were instrumental in developing a scheme together with design layouts and a quotation package to support the schools funding application.

case-alton-convent-1ex

Refurbishment of 2 labs, conversion of 1 lab, prep and store into 2 labs, plus new chemical store & refurbished corridor

The school appreciated Klick’s positive approach in working to maximise their budget and available space.

Wrekin College, Shropshire

Installation of furniture and full refurbishment of 2 science labs

As an incentive to complete this project outside of the summer holidays Klick offered a free Sixth form ICT room. Having previously worked at the school, the estates department felt confident that they could rely on Klick’s project management team to deliver the project in the limited time available.

Bishop Perowne C of E College, Worcester

Installation of furniture and full refurbishment of 5 laboratories. Decoration & flooring renewed in two prep rooms and lobby area.

Work commenced in term time for this refurbishment of an outdated science block requiring a rolling programme throughout the summer. The school opted for a cranked island design with loose tables and selected 25mm Velstone as the worktop material.

Page 1 of 3