Case Studies

Science

Emerson Park Academy

3 phase installation of furniture for 7 science labs & 6 prep rooms

Design input was key to the success of this project. Many avenues were explored in order to fully exploit the available space and the Klick design team worked on a range of options with the school in order to refine the designs.

case-university-york-1ex

Furniture Installation - Biology Department

The Department of Biology was looking for laboratories to inspire bioscience students to become confident, collaborative, adaptable and independent graduates. The brief was to come up with a cost effective solution, allowing each department to reflect their individual identity whilst facilitating the smooth running of the workspace as a whole.

Tarleton Academy, Lancashire

Installation of furniture for 5 science labs

The project required a phased installation to start in June. Only one lab could be spared during term time so a phased schedule was agreed with the school.

Adcote-School-for-Girls

Installation of furniture for 3 science labs and 1 prep room

The brief was to supply and install the furniture within 5 weeks from order confirmation to project completion.

Bodmin College

Phase 2 - Science Lab Installation

Klick initially provided a quotation package to support an application for funding from the Wolfson Foundation. The college were really pleased with their 'learning curve' lab installed by Klick 3 years earlier and wanted to replicate that design where possible.

Cirencester Kingshill School, Gloucestershire

Installation of new laboratory furniture for 2 science labs and a prep room

This project featured a number of bespoke storage features. We were asked to design a custom built services cupboard to house the heating manifold, whilst making the best use of the remaining space above. The manifold unit is incorporated into a small base cupboard which is lockable and is located within a tall storage unit used for the storage of exercise books etc.

Maiden Erlegh School, Berkshire

Installation of new laboratory furniture for 3 science labs

Maiden Erlegh School found the space for a dedicated sixth form lab by splitting one very large lab into two rooms. The smaller of the two rooms had the ideal space to accomodate 24 sixth formers.

Moreton Hall School, ShropshireNew Science Laboratory furniture and installation of new laboratory furniture for 6 labs and 2 prep rooms

Klick Technology were nominated by the school and the contract was awarded well ahead of installation so we could provide support for their M & E contractors.

Southmoor Academy, SunderlandScience laboratory refurbishment

The academy is opening a sixth form this September and needed a new science laboratory with an inspirational design on a limited budget.

St Georges School, AscotScience laboratory and prep room refurbishment

The project involved the complete refurbishment of 2 laboratories and 2 prep rooms. The priority for the school was to have the maximum flexibility of layout. Klick developed a bollard design where the tables could be moved to change the room layout completely.

Page 1 of 3