Installation of furniture and partial refurbishment of Biology Lab
Value: £22k Duration of works: 7 week phased installation
I would just like to say how pleased we are with the new lab and to thank you for all that you have done to advise and to assist in the transformation. I hope we will have further dealings soon.
Tom Adams - Head of Science, Cheltenham College, Gloucestershire
Project Details
Free comprehensive design & consultation service
2D and 3D CAD drawings provided, illustrating layouts
Project management service provided
Installation of new plumbing and electrical services
Flooring renewed
Supply & installation of furniture
Docking station for mobile fume cupboard supplied
Final connections, commissioning and certification of all works
Project Brief
The college required a layout that maximised the number of pupils accommodated in the room. The cranked island layout was selected with storage included under one side of the workbenches and a knee space under the other side, making the most of the available space. One perimeter workbench is included to the rear of the room with undermounted epoxy resin sinks. A teacher's demonstration bench is positioned to the front of the room. All worktops are 25mm Velstone.
Klick Technology installed a bench mounted docking station suitable for a mobile fume unit.
The client coordinated the strip out of the room and all decoration themselves. The project ran smoothly and was completed on time.