Klick Technology - School Furniture - Educational Furniture Products Klick Technology Darrick Wood School
Klick Technology - Case Studies

Christ The King Catholic
Maths & Computing College, Preston

Value: £454k
Architect: Cassidy & Ashton Architects, Preston
Duration of works: 16 weeks

klick sticker image turkey
"The Klick contracts team smoothly managed the logistics of completing a new build extension during term time, working during school hours with minimum disruption to the daily routine. They have always accommodated our requests and kept us informed."
Nicola Chester - School Manager, Christ The King Catholic Maths & Computing College, Preston
klick sticker image turkey

2 extensions to accommodate 2 new Science Labs, refurbishment of 2 additional Science Labs, Prep room, Food Technology room and associated rooms.

Project Details

  • Pre-installation survey
  • All groundworks and construction of new build extensions
  • Stripout of old rooms
  • Remodelling of entrance to science block
  • Channelling of floors to accept new services
  • All plumbing and electrical work
  • Design and construction of atrium
  • Installation of new UPVC windows and doors
  • Manufacture of furniture
  • Tiling and decoration
  • New flooring and ceilings
  • Installation of fume cupboards
  • New furniture installed
  • Commissioning and certification of all works


Project Brief

The school needed to find space for 2 new science labs and a food technology room. One science lab was built into an external courtyard and an extension to the main building provided space for the other.

A new corridor was built providing a new entrance to the science block. Two smaller textile rooms were combined, removing an internal wall to make space for the food technology room.

An atrium roof was built to provide more natural light for the Food Technology room and services had to be redirected to provide gas and water.

The majority of the work was carried out during term time and the final handover was on time and within budget.

See what our customers say about us...
[48kb pdf download]



Download the PDF

PDF download

View our Case Studies

Baxter Healthcare Cowley, Oxfordshire
[ Furniture for pharmaceutical aseptic suites ]
Bootle High School, Merseyside
[ Refurbishment of textile and food rooms ]
Darrick Wood Senior School, Orpington, Kent
[ Refurbishment of Food Room ]
Dr Challoner's Grammar School, Amersham
[ Installation of furniture for Biology Laboratory and Prep Room ]
Epsom & Ewell High School, Surrey
[ General Refurbishment ]
Epsom & Ewell High School, Surrey
[ ICT / Library ]
St Ambrose College, Hale Barns, Cheshire
[ Refurbishment of 1960's science lab ]
Notre Dame Catholic 6th Form, College Leeds
[ Refurbishment of 6 science labs ]
King's School, Winchester, Hampshire
[ Conversion of two ICT rooms into science lab ]
Chislehurst and Sidcup, Grammar School Kent
[ Multi-room furniture installation ]
Torc Campus, Tamworth, Staffordshire
[ Installation of special needs furniture ]
Christ The King Catholic, Preston
Mary Elliot School, Walsall, Birmingham
[ Installation of furniture for special needs school ]
Priestley College, Warrington, Cheshire
[ Conversion of 7 small rooms into Science Laboratory and Prep Room ]
Further case studies

We are registered with...

Construction LineCorgi GasCSCSCHAS