Design & Build of extension for Food Technology and ICT facility

Value: £243k
Duration of works: 12 weeks

klick sticker image turkey
"From the very start of the project all your staff were helpful and very professional. We were particularly impressed by the 'can do' attitude and willingness to adapt where necessary. They helped with the design and produced great drawings to assist the food technology teachers with visualising the finished product. Despite numerous changes Klick were always very helpful. Communication was excellent and the College was kept informed at all times of what was going on. All of the work was carried out efficiently, with the minimum of disruption, and to a very high standard..."
John Harratt - Site Manager, Kings International College for Business and the Arts, Camberley, Surrey
klick sticker image turkey

Project Details

  • Co-ordination of planning application and liaison with building control officer
  • Free comprehensive design and consultation service
  • 2D and 3D CAD drawings provided, illustrating layouts
  • Full project management service
  • All groundworks and construction of extension
  • Removal of existing furniture and redundant services
  • Remove all internal walls and doors as required
  • Complete upgrade of electrical and mechanical services including relocation of mains switch room
  • Upgrade of heating system & installation of air handling unit
  • Supply of 6 electric & 6 gas ovens, fridges, freezers, washing machines & tumble dryers
  • Appliances installed, connected and commissioned
  • Provision for interactive services
  • Remove existing radiators & installation of air conditioning
  • New safety flooring fitted
  • Supply and installation of furniture
  • New ceilings & decoration
  • Supply & installation of partial blackout blinds
  • All works guaranteed and certificates issued

Project Brief

Klick technology were involved from the very early stages of this project, advising on the feasibility of providing space for a new Food Technology facility. We designed the plans for the conversion of a French room, corridor, toilet block, office and mains switch room into a brand new Food Technology space including an ICT suite.

Klick Technology submitted the planning application and provided full project management on site. The project ran through term time with minimum disruption to the school day and was completed on time.

See what our customers say about us...



Download the PDF

PDF download

View our Case Studies

Islamia Girls School London
[ Food Technology room refurbishment ]
Halesowen College, West Midlands
[ New Science Laboratory furniture and installation of new laboratory furniture for 8 labs and 5 prep rooms ]
Windsor Park Middle School, Uttoxeter
[ Installation of furniture for food technology room and prep area ]
Wyvern College, Salisbury, Wiltshire
[ Refurbishment of 3 science labs and partial refurbishment of 4th lab ]
Brannel School, St Austell, Cornwall
[ Installation of specialist fixed furniture for 69 rooms ]
Chipping Norton School, Oxfordshire
[ Installation of furniture for new build science block ]
Scarborough College, North Yorkshire
[ Complete Refurbishment of Biology Lab S8 ]
Beech Hill Community Primary School
[ Installation of furniture for new build school ]
Robert Bloomfield Academy, Bedfordshire
[ Installation of furniture for 2 Science Laboratories and 2 Prep Rooms ]
Gen-Probe Life Sciences
[ Supply and installation of furniture for Genetic Testing Facility ]
Baxter Healthcare Cowley, Oxfordshire
[ Furniture for pharmaceutical aseptic suites ]
Darrick Wood Senior School, Orpington, Kent
[ Refurbishment of Food Room ]
Dr Challoner's Grammar School, Amersham
[ Installation of furniture for Biology Laboratory and Prep Room ]
Epsom & Ewell High School, Surrey
[ General Refurbishment ]
Epsom & Ewell High School, Surrey
[ ICT / Library ]
St Ambrose College, Hale Barns, Cheshire
[ Refurbishment of 1960's science lab ]
Notre Dame Catholic 6th Form, College Leeds
[ Refurbishment of 6 science labs ]
King's School, Winchester, Hampshire
[ Conversion of two ICT rooms into science lab ]
Chislehurst and Sidcup, Grammar School Kent
[ Multi-room furniture installation ]
Torc Campus, Tamworth, Staffordshire
[ Installation of special needs furniture ]
Christ The King Catholic, Preston
[ Extensions to accommodate 2 new Science Labs ]
Mary Elliot School, Walsall, Birmingham
[ Installation of furniture for special needs school ]
Priestley College, Warrington, Cheshire
[ Conversion of 7 small rooms into Science Laboratory and Prep Room ]
Sussex Coast College
[ Design & Installation ]
Rochester Grammar School
[ Installation of furniture for new build school ]
Woodchurch High School Wirral
[ Installation of specialist fixed furniture ]
Further case studies
See what our customers say about us...

We are registered with...

Construction LineGas Safe RegisterCSCSCHAS