Klick Technology - Case Studies

Priestley College, Warrington, Cheshire

Value: £60k
Duration of works: 4-5 weeks on site

klick sticker image turkey
"I am really pleased with the responsiveness of the staff at Klick Technology at every stage. The work was completed to a very tight timescale and was within budget. We also felt that we gained value for money."
Julie McCann - Vice Principal (Resources), Priestley College, Warrington
klick sticker image turkey

Conversion of 7 small rooms into Science Laboratory and Prep Room

Project Details

  • Disconnect existing services and make safe
  • Stripout of classroom and 6 old storerooms/offices
  • Removal of existing stud and brick dividing walls
  • Diamond core drilled floor to accept new services
  • Redundant doorway blocked up
  • New doorway built to suit reconfiguration of rooms
  • Installation of all new plumbing and electrical services
  • Provision for interactive services
  • Ceilings, flooring, lighting and decoration renewed
  • New furniture and 3 fixed fume cupboards fitted
  • Commissioning and certification of all works


Project Brief

The design for this room was still under discussion at the end of June. The College were hoping to complete the project over the summer holidays, but our order book was already full. We agreed to a completion date of mid September. The noisy stripout work was commissioned in the summer and the rest of the work was completed in termtime as agreed, with minimum disruption to the school.

The brief was to convert one small classroom and six storerooms/offices into a spacious new lab and adjoining prep room. Existing stud partition walls and a brick dividing wall had to be carefully removed. We provided a new electrical distribution board and installed Cat 2 lighting. The supply of gas, water and waste services were extended from the floor below. Flooring and decoration were renewed to complete the project.

See what our customers say about us...
[48kb pdf download]



Download the PDF

PDF download

View our Case Studies

Baxter Healthcare Cowley, Oxfordshire
[ Furniture for pharmaceutical aseptic suites ]
Bootle High School, Merseyside
[ Refurbishment of textile and food rooms ]
Darrick Wood Senior School, Orpington, Kent
[ Refurbishment of Food Room ]
Dr Challoner's Grammar School, Amersham
[ Installation of furniture for Biology Laboratory and Prep Room ]
Epsom & Ewell High School, Surrey
[ General Refurbishment ]
Epsom & Ewell High School, Surrey
[ ICT / Library ]
St Ambrose College, Hale Barns, Cheshire
[ Refurbishment of 1960's science lab ]
Notre Dame Catholic 6th Form, College Leeds
[ Refurbishment of 6 science labs ]
King's School, Winchester, Hampshire
[ Conversion of two ICT rooms into science lab ]
Chislehurst and Sidcup, Grammar School Kent
[ Multi-room furniture installation ]
Torc Campus, Tamworth, Staffordshire
[ Installation of special needs furniture ]
Christ The King Catholic, Preston
[ Extensions to accommodate 2 new Science Labs ]
Mary Elliot School, Walsall, Birmingham
[ Installation of furniture for special needs school ]
Priestley College, Warrington, Cheshire
Further case studies