I would highly recommend Klick Technology to any other school looking for a company to provide a comprehensive refurbishment project. They arranged a visit to another local school as a reference site and were happy to revise drawings and work with us in order to refine the layout. With their help and guidance we have ended up with a lab that we are really pleased with. Javed, David, Claire and the team worked hard to ensure that the refurbishment was completed with ease and little disturbance to the school even though the work was completed during term time.
Michele Gormley - School Business Manager, Ralph Sadleir School, Puckeridge, Hertfordshire
Project Details
Free comprehensive design & consultation service
2D and 3D CAD drawings provided, illustrating layouts
Full project management service
Removal of existing furniture and redundant services
Channel floor to accept new services
Construct new partition wall for whiteboard
Construct wall & doorway for access to prep
Remove 2 existing radiators & install 2 new convectors
Installation of all new plumbing and electrical services
Provide for interactive services
Ceilings, flooring, lighting and decoration renewed
Supply & installation of furniture
Commissioning and certification of all works
Project Brief
There was an extensive design process for this project which resulted in a layout which accomodates 30 students, maximises limited space and has flexibility of use.
Two Velstone topped tables can be positioned adjacent to the wall for the teacher to control the interactive whiteboard or can be moved away from the wall for demonstrations.
The room also features a flexible teaching area which comprises Velstone benching and a run of sockets above which can be used as an ICT area. Mobile cupboards are stored underneath and can be wheeled away when necessary.
To make the most of the available space and budget, bollards with internal tray storage were selected. Velstone was used throughout the lab but in the prep room savings were made by using Trespa.
This refurbishment project was co-ordinated around other contractors within the school but was still completed one week early.