Complete Refurbishment of Food Technology and Theory Room
Value: £48k Duration of works: 4 weeks
"We are very impressed with the care and service that Klick Technology provided during the summer holidays refurbishing our food tech room. Nothing was too much trouble. The project was completed on time and within budget. Excellent communication between Klick & school."
Debbie Donoghue - Premises Manager, The Royal Latin School, Buckingham
Project Details
Free comprehensive design and consultation service
2D and 3D CAD drawings provided, illustrating layouts
Full project management service
Removal of existing furniture and redundant services
Board up existing windows and door opening
Complete upgrade of electrical and mechanical services
Provision for 5 electrical & 6 gas ovens
Provision for interactive services
Remove existing radiators and install new
New safety flooring fitted
Supply and installation of furniture
Decoration renewed
Appliances installed, connected and commissioned
All works guaranteed and certificates issued
Project Brief
The layout of this space, which had previously been two rooms, needed to be improved to provide a designated theory area at one end of the room and a well designed practical area at the other.
Budget restraints meant that air conditioning was not an option in this room and therefore radiators were installed above the worktops, making the most of the available wall space.
The design was developed in conjuction with the teaching staff at the school, who selected Velstone as the worktop material. Extra deep worktops were necessary to allow space for existing services.