Phase 1 - Installation of furniture for 2 science labs/prep room
Phase 2 - 2 design studios, 3 3D workshops including ceramics, screen printing, textiles, fashion & general classroom
Total Project Value: £135k Client: Phase 1 - Laing O'Rourke, Phase 2 - Direct with College Project Manager: Davis Langdon Duration of works: 8 weeks
"Klick Technology helped Sussex Coast College, Hastings throughout the entire fitout process from design to installation at our new flagship College.
They clearly understood our requirements and helped solve problems and issues as they arose throughout the process.
We are now looking forward to working with Klick again on our second site, ready to meet our requirements from order to completion over the next 3 months.
I would unreservedly recommend Klick to anyone as a capable and reliable supplier of a quality product."
Adrian Rogerson - Project Director, Sussex Coast College, Hastings
Project Details
Production of 2D & 3D layouts
Pre-installation survey
Close liaison with M & E contractors
Manufacture of furniture
Delivery and distribution of furniture on site
Installation of all fitted furniture
Final connections
Project Brief
Sussex Coast College is a prestigious £97 million state of the art campus development for sixth form students.
The brief for Phase 1 was to provide two contrasting labs, one to be contemporary with solid surface benching and the other using Iroko benching to create a more 'Darwinian' feel. Klick Technology developed the design of the rooms in conjunction with the college, the project manager and main contractor.
In Phase 2 a bespoke jewellery work bench was designed from 40mm Maple whilst Trespa benching was selected for the majority of the other workshops.