Refurbishment of 3 science labs and partial refurbishment of 4th lab
Value: £142k Duration of works: 9 week phased programme Client: Diocese of Salisbury
The original order was very close to the proposed start date, but the Klick team were very quick at delivery and installation. All minor snagging was done with the minimum of fuss...
Barry Dawkins - Building Technician, Diocese of Salisbury
Project Details
Free comprehensive design & consultation service
2D and 3D CAD drawings provided, illustrating layouts
Full project management service
Removal of existing furniture and redundant services
Channel floor to accept new services
2 existing windows and a door removed and blocked up
Installation of all new plumbing and electrical services
Provide for interactive services
Ceilings, flooring, lighting and decoration renewed
Supply & installation of furniture
Fixed Fume cupbard supplied & fitted
Commissioning and certification of all works
Project Brief
The college selected a bollard layout for their 3 new laboratories. The bollards were 600mm square with gas and elecric services supplied from the floor. All worktops were Pale Blue 16mm Trespa and the perimeter units featured blue tray storage. Stools were provided to complete the rooms.
The college had a strict budget and therefore economies were made in the 4th lab where octagonal worktops were renewed but the existing cupboard carcasses were reused. Doors were also carefully removed to be reused elsewhere.